ccn-constructiın-header-logoccn-constructiın-header-logoccn-constructiın-header-logoccn-constructiın-header-logo
  • Home Page
  • Corporate
    • Management’s Message
    • Board of Directors
    • Corporate Values
    • Corporate Social Responsibility
      • İbrahim Çeçen Foundation
      • Ağrı İbrahim Çeçen University
    • Ethical Principles and Policies Guide
    • Policies
      • Quality, Health, Safety, And Environmental Policy
      • Corporation Social Responsibility
      • Human Resources Policy and Principles
      • Responsible Purchasing Policy
      • LPPD Policies
    • CCN Past and Present
  • Sectors
    • Construction
    • Health
    • Service
    • Security
    • Technic
    • Clinic
    • Education
    • ICE Yacht
    • Wisera
    • Infera
    • CC’n’Works
  • Sustainability
    • Sustainability Policy
    • Sustainability Report
      • 2021 Sustainability Report
      • 2022 Sustainability Report
      • 2023 Sustainability Report
    • Sustainability & CCN
  • Supplier Registration
  • Press Room
    • Print Media
    • Visual Media
    • Our Awards
  • Career
  • TR
✕

Bilkent City Hospital - ANKARA

Bilkent City Hospital - ANKARA

City Hospital - MERSIN

City Hospital - MERSIN

Haydar Aliyev Center - BAKU

Haydar Aliyev Center - BAKU

Flame Towers - BAKU

Flame Towers - BAKU

Altunizade Suites Istanbul, Curio Collection by Hilton - ISTANBUL

Altunizade Suites Istanbul, Curio Collection by Hilton - ISTANBUL

Prof. Dr. Dimitrie Gerota Emergency Military Hospital - BUCHAREST

Prof. Dr. Dimitrie Gerota Emergency Military Hospital - BUCHAREST

Ted Izmir College- IZMIR

TED Kocaeli College - KOCAELI

Infrastructure Connections - GUSAR - SHAHDAG

Tourism Complex - SHAHDAG

Premium Villas - BAKU

Bilgeh Villas - BAKU

State Coastal Facilities - BAKU

Administration Building & Residence - QEBELE

Republic of Turkey Ministry of Health Service Building - ANKARA

CCN Construction conducts project management activities, especially in the design and construction of prestigious and large-scale superstructure projects in which CCN Group acts as an investor. Specialized in the design and construction of integrated health campuses.

Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.

Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.

TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.

Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.

Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.

Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.

With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.

Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.

47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region. All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.

Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².

Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.

Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank. Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.

Located in the central district of Altunizade in Istanbul, this urban hotel project will operate under the Curio Collection by Hilton brand and offers a comprehensive program that enhances the accommodation experience. Designed with 240 guest rooms, the project includes a 105-seat conference hall, a 1,856 m² spa & fitness area, and a 493 m² restaurant, catering to both business and leisure travelers.

Developed on a 16,029 m² plot, the project has been revised to a total gross construction area of 31,964 m² following concept updates and the removal of basement levels. The rooms, thoughtfully distributed across the floors, prioritize user comfort, while the entrance, service, and technical infrastructure have been redesigned in accordance with Curio Collection standards and contemporary urban hospitality principles. The architectural language features modern lines and emphasizes operational efficiency and sustainability.


Funded by the European Union and located in Bucharest, the capital of Romania, the MAI Dimitri Gerota Hospital stands as a benchmark in modern healthcare architecture with its 92,201 m² of enclosed space. This 450-bed medical complex features 40 operating rooms, 50 intensive care units, a 14,300 m² covered parking area, and a 26,216 m² landscaped zone. The hospital embraces a sustainable and environmentally conscious approach with a seismically isolated structure, energy-efficient design aligned with NZEB (Nearly Zero-Energy Building) standards, solar panels, and 3,000 meters of geothermal wells. Equipped with advanced medical infrastructure and a helicopter landing pad, the facility aims to serve not only local healthcare needs but also regional health tourism. Human-centered design principles such as patient comfort, accessibility, privacy, and natural light are at the core of all architectural and technical decisions.

Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
Construction
CCN Construction conducts project management activities, especially in the design and construction of prestigious and large-scale superstructure projects in which CCN Group acts as an investor. Specialized in the design and construction of integrated health campuses.

Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.

Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.

TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.

Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.

Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.

Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.

With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.

Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.

47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region.

All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.

Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².

Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.

Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank.

Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.
Contact
İstanbul Headqurters

+90 216 225 86 00
info@ccnholding.com
Altunizade Mah. Oymacı Sok.
No: 20 Üsküdar / İstanbul

Ankara Office

+90 312 220 24 00
info@ccnholding.com
Üniversiteler Mah. 1604 Cad. No: 9/1
İç Kapı No: 114 Çankaya / Ankara

Social Media

2025 CCN Holding. All Rights Reserved.
Ansolon